03 / AN ILLUSTRATIVE STARTING POINT
One agreed shared-services board
Power in kW and stored energy in kWh are different specifications. Both need to be checked.
40 kWSelected running load
0.75 hIllustrative duration
~37.0 kWhNominal energy before margins
40 kW × 0.75 h ÷ (0.90 × 0.90)
A hypothetical 40 kW shared-services load for 45 minutes.
Independent buildings and transfers across unreviewed electrical boundaries are excluded.
Assumes 90% usable battery energy and 90% conversion efficiency for explanation only. Actual output, usable capacity, ageing, temperature, reserve and surge requirements change the design. This is not a quoted package or a backup guarantee.
Reference: EIA explanation of power and energy capacity ↗