Power in kW and stored energy in kWh are different specifications. Both need to be checked.
13 kWSelected running load
1 hIllustrative duration
~16.0 kWhNominal energy before margins
13 kW × 1 h ÷ (0.90 × 0.90)
A hypothetical 13 kW service-load group for one hour.
Cable sizing, connection losses and route suitability need project-specific checks.
Assumes 90% usable battery energy and 90% conversion efficiency for explanation only. Actual output, usable capacity, ageing, temperature, reserve and surge requirements change the design. This is not a quoted package or a backup guarantee.