03 / AN ILLUSTRATIVE STARTING POINT
Selected circuits across two office floors
Power in kW and stored energy in kWh are different specifications. Both need to be checked.
7 kWSelected running load
1.5 hIllustrative duration
~13.0 kWhNominal energy before margins
7 kW × 1.5 h ÷ (0.90 × 0.90)
A hypothetical 7 kW agreed essential-load group for 90 minutes.
Separately metered occupants and untraced sockets are not included.
Assumes 90% usable battery energy and 90% conversion efficiency for explanation only. Actual output, usable capacity, ageing, temperature, reserve and surge requirements change the design. This is not a quoted package or a backup guarantee.
Reference: EIA explanation of power and energy capacity ↗